News · · 4 min read

Samson Sky asks Cresa to look for a first U.S. Switchblade plant; no site is chosen

Samson Sky said on November 11, 2026, from Prineville, Oregon, that it engaged Cresa to help find a site for a first U.S. Switchblade production facility. The release says that facility will be 200,000 square feet and that the search is in early stages. No site is chosen and no production start date is stated. No type certificate is stated. The release image is a rendering. A September release's 180,000 square feet is not replaced here.

Samson SkySwitchbladeCresa

Silver Switchblade aircraft with wings extended and tail surfaces raised, low over a runway with the landing gear down
Photograph General Aviation News published on November 13, 2026. Its caption says the first flight of the Samson Switchblade, and credits Samson Sky. The file path on that page includes 2023/11. The caption does not name an airport. It is not a photograph of a factory site. The November 11 release image is a separate file, captioned there as a rendering, and is not this photograph. Image: Samson Sky

Samson Sky said on November 11, 2026, in a release datelined Prineville, Oregon, that it has engaged Cresa to help locate the site for its first U.S. production facility for the Switchblade. The release's subhead says the site-selection effort follows Samson securing an $80 million investment from Matin Group, for establishment of a 200,000 square foot U.S. production facility. General Aviation News reported the announcement on November 13. eVTOL Insights, dated 12 November 2026, also reported it. Cresa's own news page did not load, so it is not used here.

The release says this first U.S. facility will be 200,000 square feet and will include advanced parts manufacturing, vehicle assembly and interior finishes. It says Samson will also provide pilot training, Switchblade maintenance training and a professional driving class, either in this facility or one nearby. It says the complex will be the first of several production facilities Samson intends to establish. "Intends" is the release's word. It says the process is in early stages, and that states proposed for review include Utah, Nevada, Texas, Florida, New Mexico, Kentucky and North Carolina. It says the existing research and development centre will continue in Prineville. eVTOL Insights says the company has not identified a preferred state and has not provided a timetable for selecting a site or beginning construction. No site is chosen. No production start date is stated.

The September funding row is not a new round

The $80 million from Matin Group is already on this site, from Samson's September 15, 2026 release. That release described a planned 180,000 square foot facility and said $20 million more still had to be raised. It did not show the funds as received in a filing. The November 11 release says the $80 million has been secured and states 200,000 square feet. It does not mention the remaining $20 million, and it does not cite a filing. This page does not open a second funding row. It does not replace 180,000 with 200,000 as if the September figure had not been published. It does not treat "secured" as a completed closing.

What the company says about the aircraft

Sam Bousfield, whom the release identifies as founder and chief executive, says a carbon-fiber parts process cuts the price in half and is 8 times faster than traditional epoxy carbon fiber, and that industry-standard testing has validated the material. The release says the company describes near-zero manufacturing waste. Those are the company's claims. No purchase price for the Switchblade is stated. General Aviation News renders the speed claim as "eight times." eVTOL Insights says Samson claims the process can reduce costs by half and increase production speed eightfold.

The release says the Switchblade is an experimental-category aircraft, and that the FAA issues what the release calls "a special type of certification" for experimental aircraft, known as a Special Airworthiness Certificate. A special airworthiness certificate is not a type certificate. The release says the owner must build 51 percent, during one week at a builder-assist centre, and that Samson then completes the vehicle and helps the owner submit documentation to the FAA. That is a description of a process. It is not a statement that a type certificate has been issued, and it is not a statement that customer certificates have been granted.

The about section says the Switchblade transforms from driving to flying in three minutes, and that it is meant to address regional travel of 200 to 500 miles. Those are the company's words. The 200-to-500-mile band is not a range this page measured. The same section says the official first flight was in November 2023 at Grant County International Airport in Washington state, and that there are nearly 3,000 orders from over 50 countries and all 50 U.S. states. General Aviation News says the company reports reservations from more than 50 countries. It does not say 3,000, and it does not say all 50 states. The September 26 company page, already recorded here, described a deposit or a reservation and did not call those firm orders. "Orders" in the November release is not recorded on this page as a firm purchase book.

The images

The photograph on this page is the one General Aviation News published, captioned "The first flight of the Samson Switchblade" and credited to Samson Sky. The file path on that page includes 2023/11. The caption does not name an airport. This page does not match the frame to Grant County on its own. It is not a photograph of a factory site, and it is not a photograph of a chosen state.

The Access Newswire release image is a rendering. The caption on that page begins "Switchblade Flying Car (rendering)" and describes a vehicle that drives to an airport, flies, and encloses the wings, tail and propellers while driving. That file is a split view of a car on a coast road and an aircraft over a shoreline. It is not a photograph. It is not a picture of a site Cresa has found. No site has been chosen.

What is not established

No site is chosen. No production start date is stated. No type certificate is stated. A special airworthiness certificate is not a type certificate. The November wording does not close the September funding, and it does not erase the September 180,000 square foot figure. "Nearly 3,000 orders" is not recorded as a firm order book. The carbon-fiber cost and speed claims are the company's. Cresa's own page did not load. The release image is a rendering.

Sources

Facts as reported by the linked sources as of Nov 23, 2026. Company targets are plans, not guarantees. Corrections: see About.